Crane Services · Barge · PM · Manpower

Built On Trust,
Driven By Results.

Heavy-lift services, barge fleet, project leadership, and elite labor — for the work that can't fail.

Scroll

0+

Years In Operation

0+

Lifts Completed

0+

Tons Moved

Our Services

Built To Move The Job Forward.

Four service lines, one operating standard. Pick the entry point that fits your project — every path connects.

Projects Since 2025

Coast To Coast.

Every pin marks a Craneaholics project completed since 2025 — wind farms, refineries, infrastructure, and inland waterways. Hover any pin to see the job.

0+

Projects Since 2025

0

States Reached

US project map 89m Turbine · IL 10 Turbine Repower · Encino NM Bridge Lift · Bryan, TX Main Bearing Exchange · Kansas 300T Crane Barge Project · LA Wind Farm Build · Oklahoma City, OK Heavy Industrial · Tulsa, OK Wind Farm Mobilization · NV Wind Energy · Tehachapi, CA Repower · V120 Wind Farm Wind Farm Build · White Hills, AZ Wind Farm Build · Harmon, IL

Active project location

Where We Work

Industries We Move.

From offshore-bound rotors to refinery turnarounds — we built our operations around the projects that can't fail.


How It Works

How A Job Gets Done.

Four steps from inquiry to demobilization. Predictable, documented, on-spec.

01

Inquiry & Scope

You send the job. We respond in under 48 hours with a working scope, capabilities, pricing, and the crane and or crew for the job.

02

Site Survey & Plan

Our project managers walk the site, model the geometry in 3D CAD, and lock in the lift details such as load charts, ground bearing pressure limitations, and rigging.

03

Quote & Mobilize

Fixed or rate based quotes, mobilization window, insurance docs, crew certifications delivered and lift plan delivered. Iron starts moving.

04

Execute & Demob

Project execution, daily reports, full demobilization, and a closeout package. No surprises, no left-on-site messes or surprise charges.

Start A Project
2026 Project Highlights

See Live Action Videos From 2026 Projects

From Wind Farm Components to marine construction projects, we tackle all challanges!

89T

Tons Lifted

285ft

Lift Height

7 Days

On-Site Duration

Trusted By

What Our Clients Say.

“Craneaholics ran a 380-ton lift on a tight downtown site without a single late hour. Best crew we've worked with.”
Project Director

Project Director

Industrial GC

“Their barge fleet hit our window when no one else could. Mob in 72 hours, demob clean.”
Construction Manager

Construction Manager

Marine Contractor

“Lift planning was done before our kick-off. They brought the rigging package, the load chart, and the operator we asked for.”
Site Superintendent

Site Superintendent

Wind Energy Developer

Wear The Brand

Crane Swag.

Heritage workwear and field-tested gear made for crews who run heavy iron.

Shop The Drop
Start A Project

Get A Quote In 24 Hours.

Tell us the job. We respond fast with a working scope, capabilities check, and the right rig.

  • Fully Insured · $5M GL
  • USCG Certified Fleet
  • NCCCO Certified Operators
  • 24/7 Mobilization Available

Response within 24 hours · No spam · No obligation