BSF Mobile Cranes adds a 450-tonne LTM 1400-6.1 for heavy lift and the first MK 88-4.1E in Australia for tight inner-city work — two very different answers to two very different problems.
Hanchang Heavy Equipment took delivery of a 2,500-tonne LR 12500-1.0 crawler and put it straight to work setting jacket substructures at an SK Ocean Plant offshore wind farm.
Grúas Aguilar put seven Liebherr cranes over a live Madrid motorway to build a 16,000 m² park — working 10 p.m. to 6 a.m. so the M-30 opened on time every morning.
Richter Kran- und Schwerlast set a 105-tonne bridge segment with two LTM 1750-9.1s at 4 a.m. — and the reason for that start time is the most interesting part of the whole job.